DURKOPP ADLER 540 - 100 Betriebsanleitung Seite 28

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 28
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 27
10. Sewing test
After completion of the assembly, a sewing test should be made.
Wind up bobbin thread (see operating instructions chapter 3.2)
Caution: Danger of injury !
Switch off main switch.
Thread in the needle and bobbin thread only w hen the s ewing automat
is switched off.
Thread in the needle thread (see operating instructions
chapter 3.1).
Place the bobbin and its housing (see operating instructions
chapter 3.2 and 3.3).
Switch on main switch.
The control unit is initialized.
Choose a workpiece to be processed.
Begin with a low speed at first (see operating instructions).
Gradually increase the speed.
Check that the buttonhole meets the desired requirements.
If not: Alter the thread tension (see operating instructions
chapter 3.7).
If needed please check also the setting instructions described
in the service instructions.
24
Seitenansicht 27
1 2 ... 23 24 25 26 27 28

Kommentare zu diesen Handbüchern

Keine Kommentare